Home View Shopping Cart Contact Us Home
Subscribe to Drafting Zone
Drafting Practices and StandardsGeometric Dimensioning & Tolerancing Study ZoneTips & ToolsInspection GuidesAsk Gary WhitmireConfiguration data management advisories
blue circleData/Configuration Management Advisories
  • Drawing Changes Guide (HTML Version)- New!
    When does a drawing change require a new part identification? Drawing standards say that there are five specific conditions and this Configuration Management Advisory clearly and succinctly tells you when a new identification is required.


Configuration management is a process that assures that a product is properly documented so that the same product can be duplicated over and over again. This is done primarily with drawings and a bill of materials which establish a product baseline. Configuration management is extremely important when a change is made to a product. It controls the product change so that no change can be made without proper documentation; thereby formally notifying everyone that a change has been made. Configuration management can be the responsibility of one individual or an entire department.
  • Introduction to Configuration Management
  • Implementing Engineering Change Orders
    This Advisory discusses how to implement design/drawing changes based on the type of change. The two types of changes (class 1 and class 2) are fully explained.
  • Design Review
    A proper Design Review can find problems before they reach manufacturing; helping a company to "do it right the first time."
  • Performance Specifications
    This advisory discusses the relationship between the Performance Specifications design document and the Configuration Management control process.
  • Control Drawings
    This Configuration Management Advisory discusses the 3 types of control drawings specified in ASME Y14.24-1999. The three types of control drawings are: procurement control drawings, vendor item control drawings (VICD), and source control drawings (SCD).
  • Determining Required Drawing Types for Procured Items Flowchart
    Determining the required drawing(s) for procured items is not easy. This flow chart will help you make the right decisions.
  • Specifying Revisions of Standards or Specifications on Drawings
    The general rule is that revisions should not be specified, but a major drawing standard is an exception to this rule.
  • Drawing Changes Guide (HTML Version)
    When does a drawing change require a new part identification? Drawing standards say that there are five specific conditions and this Configuration Management Advisory clearly and succinctly tells you when a new identification is required.
Log In

Home
Home
About Drafting Zone
Subscribe to Drafting Zone
Guest Room
Meet the Experts
FAQ
Shopping Zone
Contribute
Resources
Contact Us